Futuna 50 aluminum hull sailboat construction is well advanced

The hull, interior joinery and composite work of the Futuna 50 number 1 and 2 are completed. Teak work and equipment are being installed. Construction is of highest standard and the boat should be put in the water this summer.

Aluminum hull and composite deck construction

Rounded no shine aluminum hullAluminum hull workComposite gel coat work

aluminum hull with primerinterior joinery workaluminum hull with joinery work